1st Active Roofing carried out contracted maintenance for a medical centre in Waterthorpe, Sheffield.
We removed loose cement from both verges of the peaked roof and cut down over-hanging roof tiles. After clearing up the deteriorated parts, we strengthened the edges of both verges with 2×1 timber and fitted a new, dry verge system for a maintenance free finish.
- Contracted maintenance in Sheffield
- Beams added for support
- New dry verge system fitted